Product Details:
|
Model NO.:: | EN-130JK | Material Thickness:: | 0.4-0.7mm |
---|---|---|---|
Rolling Speed:: | 6-15m/Min | Roller Stations:: | 14 Stations |
Hydraulic Cutting Power:: | 5.5kw | Material Of Shaft:: | 45 Steel |
Transport Package:: | Plastic Film, Container | HS Code:: | 845522100 |
High Light: | glazed tile roll forming machine,roof and wall panel roll forming machine |
12-16 Rows Roof Panel Roll Forming Machine With 5 Ton Hydraulic De - Coiler
1. Specification:
No. | Item | Description |
1 | Raw material Standard | 1000mm |
2 | Working Speed | 1-3m/min (not including cutting time) |
3 | Roller Stations | 13 stations |
4 | Material of Roller | 45# steel quenching process and chrome coated |
5 | Material of Main Shaft | 45 steel forged, |
6 | Material of Shaft | 70 mm forged 45#steel, quenching process |
7 | Main Motor Power | 4KW |
8 | Electrical Hydraulic Station Power | 4KW |
9 | Hydraulic Station Pressure | 12.0 Mpa |
10 | Electrical Control System | PLC Panasonic Japan |
11 | Dimension (L*W*H) | 6500mm*1250mm*1300mm |
12 | Material of Cutter | Cr12 Mov HRC 58-62 |
13 | Driving Mode | single chain 1 inch |
14 | Material Thickness | 0.25-0.8mm |
15 | Cutting accuracy | ±2mm |
16 | Power Supply | 380V, 60HZ, 3 PHASES |
2. Supply range:
No | Item | Qty | Remark |
1 | 5 ton manual decoiler | 1 | |
2 | roll forming machine | 1 | |
3 | Hydraulic station | 1 | |
4 | Electric cabinet | 1 | |
5 | 3m receiveing table | 2 | |
6 | Document | 2 | Operation manual |
7 | Spare parts | 1 set |
3. Equipment arrangement drawing(sample)
A:We have professional technicians for loading
Guaranteed the goods load into container without any damage.
B:Transportation : Machines need one 40 feet container to hold
Guarantee:
A: Guaranteed against malfunctions due to manufacturing defects for 1.0 year after date of purchase. Space parts will be made free of charge,but freight cost should be paid by buyer.
B: Space parts will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Commissioning:
1 technician for 7 working days from seller to buyer’s side for the instruction of installation and commissioning as well training. An English-Chinese interpreter will be send by seller in case of the buyer asks. All the expenses of them including local transportation, food, laundry and accommodation in buyer’s country and visa,international tickets will be on the buyer side. The hotel shall be equivalent or better than the level of a Chinese 3 star hotel. The buyer shall provide each person USD 100 per day as pocket money.
Payment terms
- 30% by TT in advance
- 70% is paid before the shipment by TT
Delivery time: 30 days after the down payment is received
Contact Person: Amerilia cui
Tel: 008615127755788