Product Details:
|
Type:: | Cold Rolling Mill | Dimension(L*W*H):: | 6500*1300*1100 |
---|---|---|---|
Weight:: | 3-10tons, According To Customer | Oltage:: | 220v-380v-440v |
Final Product:: | Steel Plate | Shaft Material:: | 45# Steel Outer Diameter: 40mm Roll Material: |
Roll Material:: | .Forged 45# Steel0mm | Warranty:: | 12 MONTHS |
Highlight: | container board roof roll forming machine,iron sheet making machine |
1. Specifications:
Material Spec | car panel forming machine |
Main motor power | 4.0kw |
Forming speed | 8-12 m/min |
Diameter of roller | 80 millimeter |
Thickness of input sheet | 1.0-3.0 millimeter |
The width of the plate | 1200 millimeter |
The effective of the plate | 1080 millimeter |
Hydraulic station pressure | 11 kw |
Hydraulic pressure | 10 - 12Mpa |
Total Weight | 4.5 ton |
Voltage | 380 volt |
Roll stand | 11 groups |
Controlling system | PLC automatic frequency convertion controlling system. |
Size length*width*high | 6.0m*1.7m*1.3m |
Roller material | 9Cr-Si quenched |
Material of cutter | fly saw incise |
Molding method | overall shape |
2. Process of line:
Decoiler-active feeding-coil strip leveing -roll forming -measure length-cut to length-output table
3. Components of line:
No. | Name | Unit | Qty |
1 | Decoiler | set | 1 |
2 | Main machine for roll forming | set | 1 |
3 | Automatic control system | set | 1 |
4 | Hydraulic system | set | 1 |
5 | Automatic fly saw cutting | set | 1 |
6 | Output table(Products receiving tables) | set | 1 |
4. Spare parts ( for free)
1. Easy damaged parts: conk 2 pcs, fuse-link 4 pcs;
2. Rubber mat 1 pcs;
3. Bolt spanner 1 pcs
Remarks
Payment terms |
30% T/T in advance and balance 70% after inspection confirmation before shipment. |
Delivery | within 45 working days after receipt of deposit. |
Packing | Nude packing with 1*40HQcontainer |
Warranty | One year, and we will provide the technical support for the whole life. |
Installation |
1.Training: the buyer should charge of visa, return ticket, food and accommodation overseas and USD100/person/day for salary. 2. Need one technician 3. Training time: one week (contains the time of installation and adjustment) |
Contact Person: Amerilia cui
Tel: 008615127755788