Product Details:
|
Type:: | Tile Forming Machine | Production Capacity:: | 8-12m/min |
---|---|---|---|
Power(W):: | 7kw | Dimension(L*W*H):: | 7.5*1.35*1.2m |
Voltage:: | 380v 50HZ 3 Phase | Controller:: | PLC |
Roller Driven Type:: | Chain Transmission | Steel Plant Thickness:: | 0.3-0.80mm |
Warranty:: | 1 Year | ||
High Light: | ridge cap machine,ridge cap forming machine |
High Efficiency Ridge Cap Roll Forming Machine 20Mpa 0.05mm Cr - Plating
Technical parameters: | |||
1 | Name of commodity & specification | Ridge tile roll forming machine | |
2 | Main motor power | 4kw, 3 phase | |
3 | Hydraulic motor power | 3kw | |
4 | Hydraulic Pressure | 10-12MPa | |
5 | Voltage | 380V /3phase/ 50 HZ (or as your requirement) | |
6 | Control System | PLC Delta Inverter | |
7 | Main Frame | 400mm H-Beam | |
8 | Backboard Thickness | 18mm | |
9 | Chain Size | 33mm | |
10 | Feeding Material | color steel coils | |
11 | Feeding Thickness | 0.3-0.8mm | |
12 | Feeding Width | 600mm | |
13 | Effective width | 312mm | |
14 | Productivity | 4-8m/min | |
15 | Roll Station | 14 | |
16 | Roller Diameter | 65mm | |
17 | Roller material | 45# steel | |
18 | Cutter material | Cr12 , quenched | |
19 | Cr-Plating Size | 0.05mm | |
20 | Overall Size | 7500×1000×1200mm | |
21 | Total Weight | 3.8T | |
22 | Components | Manual Uncoiler-------------------1 set Guiding Platform------------------1 set Coil Strip Leveler------------------1 set Main Machine of Roll Forming------1 set Electric-Motor---------------------1 set Glazed Tile Pressing Device--------1 set Cutting Device--------------------1 set Hydraulic Station------------------1 set PLC Control-----------------------1 set Supporter Table-------------------1 set |
|
23 | Workflow | Manual decoiling----feeding and guiding----roll forming----pressing----cut to length----run out table | |
24 | Package | nude in the container | |
25 | Minimum order quantity | 1 set | |
26 | Payment terms | T/T(30% T/T pay in advance, the remaining 70% pay before ship) | |
27 | Delivery time | 30 working days later after receiving the deposit |
Packaging Details: | Main machine is nude, the computer control box is packed with wooden frame. |
Main machine is nude in the container, the computer control box is |
|
Delivery Detail: | 20 days |
1: How to play order: Inquiry---confirm the profile drawings and price----confirm the PI---arrange the deposit or L/C---then OK
2: How to visit our company:
Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),then we can pick up you.
3: When we exported the machines:
We have been making and exporting the machines since from the year of 1998.
Contact Person: Amerilia cui
Tel: 008615127755788